CDR30 logo
Loading Events

« All Events

Hybrid Event
  • This event has passed.

Building with stone, storing CO2: through ERW

November 15 @ 13:30 to 14:00 -03
Hybrid Event

Building with stone can replace steel and concrete. Gabbro and Basalt stones are ideal for both, building and ERW. The stone dust is generated by the process to cut stone blocks into slabs, which are used to replace steel and concrete. This means in effect, that replacement of steel and reinforced concrete generates a business model for scaling ERW to gigatons: a win-win-win solution. The main winner for the first time is the climate, second winner is a new business model eliminating CO2 generation through buildings and third winner is people with enough homes and healthy food. The first Gabbro stone was utilized as a business model in Italy in the middle ages for making mill stones for finest quality flour of best pasta and bread making throughout Europe. The stone was found in a small town called “Gabbro” in Tuskany/Italy. Gabbro rock powder is utmost well suitable for ERW. Gabbro can be found anywhere else, too, mainly in the global south, also in Europe, China, USA and Australia.

Key Topics:

  • Latest findings in ERW through the German CDRterra Project (cdrterra.de)
  • How the best suitable stones for ERW become a building material (LeBaMaN.de)
  • How the combination of building and ERW became a scalable business model for ERW (DACCUSS.de)

Moderator:
Kolja Kuse

Details

Organizer

Venue